Meeting on Monday 5/10/2009:

In this time we worked in distributing the tasks properly and finding ways to get our projects done within our limitations ( budget , time , knowledge).

before we go to show the summary of what we progressed here are the people participated in that meeting

1- Mahmood Alkhudary ( 0515773 )(present active)

2- Mahmudur Rahman ( 0511331 )absent

3- Imama Ushama ( 0535421 ) on leave

4- Shawgi Younis ( 0526527 ) present ( active)

5- Saleh Ashmil ( 0415921) present( active)



the list of work left is:

1-writing a report ( problem clarification and market needs)...(....................)
2-Electrical calculation and design ( motor power, control architecture, continues control)..(sale +Imama)
4- components collection and surveying the possible available means to get project done( Shawgi)
5-mechanical design and cad (Mahmood Alkhudary )
3-uploading the blog for update( Saleh)
4-programming( Imama replacement (saleh))

Sunday, October 4, 2009



The most recent meeting : 3/10/2009 sat

In this meeting we decided to work stuff in parallel ( we mean the two projects ), however our main focus was on the modeling of the " grass cutter" and the mechanical design

we come up with the last modeling which has been shown in here ,,,


the group members who were there in that meeting:

1- Mahmood Alkhudary ( 0515773 ) absent (excuse)

2- Mahmudur Rahman ( 0511331 ) absent ( no excuse)

3- Imama Ushama ( 0535421 ) absent (excuse)

4- Shawgi Younis ( 0526527 ) present

5- Saleh Ashmil ( 0415921) present


Tuesday, September 1, 2009

A new change in layout, organization and work.

Monday, August 31, 2009


A proper Functional Decomposition is drawn. It has to be checked with the lecturer.
The diagram is as follows:









NEXT STEP

As stated earlier,



  1. Morphological chart completed

  2. the alternatives will be drawn,

  3. pugh graph completed

  4. Progress report completed



To this moment, progress is very slow. I hope the team will buckle up and move faster. A drawing of functional decomposition was completed. The HOQ is nearly complete but there are some problems drawing it. The morphological chart is at the moment being sent around for updates. A meeting will be called to finalise it. Once that is done, a pugh graph will be drawn and the respective alternative will be chosen.




These are the follwong documents which can be seen. It's hard to upload it here, thats why I have uploaded it in another location.


a)Functional Decomposition




(this is just a rough)
















Sunday, August 23, 2009

You can view the complete file at



Thank You
Needs only (done by Imama)

1

Small input should be given

Good

2

Parts should be replaceable easily

Should

3

Be safe for people as well as pets

Good

4

Height of grass to be cut- moderate

Must

5

Grass to be cut should follow the

Must

6

shape of ground

Must

7

Not produce harmful wastes (like burnt petrol)

Should

8

Expected to stop on its own if there is any blockade

Good

9

It is expected to be small

Good

10

Cutter should be able to move fast

Good

11

Weight is light

Nice

12

Expected to stay on grass all time

Should

13

Temperature remains cool

Nice

14

Less noise

Should

15

Less damage expected

Should

16

Cheap to repair

Should




Metric and Values (Incomplete) (done by Imama)

The new Metric values can be taken from the document at the top of the page




We have proceeded to Concept Generalisation and at the moment coming u with the functional deployment and morphological chart. We have yet to upload the that meeting's minutes and after preparing for the midterm, it has been realised that certain things are not done properly. Thats why we have a delay. Inshallah we will update the complete PDS as soon as possible.
Thank You,