Monday, October 5, 2009

Meeting on Monday 5/10/2009:

In this time we worked in distributing the tasks properly and finding ways to get our projects done within our limitations ( budget , time , knowledge).

before we go to show the summary of what we progressed here are the people participated in that meeting

1- Mahmood Alkhudary ( 0515773 )(present active)

2- Mahmudur Rahman ( 0511331 )absent

3- Imama Ushama ( 0535421 ) on leave

4- Shawgi Younis ( 0526527 ) present ( active)

5- Saleh Ashmil ( 0415921) present( active)



the list of work left is:

1-writing a report ( problem clarification and market needs)...(....................)
2-Electrical calculation and design ( motor power, control architecture, continues control)..(sale +Imama)
4- components collection and surveying the possible available means to get project done( Shawgi)
5-mechanical design and cad (Mahmood Alkhudary )
3-uploading the blog for update( Saleh)
4-programming( Imama replacement (saleh))

Sunday, October 4, 2009



The most recent meeting : 3/10/2009 sat

In this meeting we decided to work stuff in parallel ( we mean the two projects ), however our main focus was on the modeling of the " grass cutter" and the mechanical design

we come up with the last modeling which has been shown in here ,,,


the group members who were there in that meeting:

1- Mahmood Alkhudary ( 0515773 ) absent (excuse)

2- Mahmudur Rahman ( 0511331 ) absent ( no excuse)

3- Imama Ushama ( 0535421 ) absent (excuse)

4- Shawgi Younis ( 0526527 ) present

5- Saleh Ashmil ( 0415921) present